A greedy heuristic approach for the project scheduling with labour allocation problem

• 2012
العودة
معلومات البحث
المؤلفون El-Awady ATTIA, Kouassi Hilaire EDI, Philippe DUQUENNE,
الكلمات المفتاحية Not Available
المجلة العلمية Not Available
الناشر Not Available
المجلد Not Available
العدد Not Available
الصفحات Not Available
publication.type Local
رابط البحث Open Link
المواد المرفقة Not Available
الملخص
Responding to the growing need of generating a robust project scheduling, in this article we present a greedy algorithm to generate the project baseline schedule. The robustness achieved by integrating two dimensions of the human resources flexibilities. The first is the operators’ polyvalence, i.e. each operator has one or more secondary skill(s) beside his principal one, his mastering level being characterized by a factor we call “efficiency”. The second refers to the working time modulation, i.e. the workers have a flexible time-table that may vary on a daily or weekly basis respecting annualized working strategy. Moreover, the activity processing time is a non-increasing function of the number of workforce allocated to create it, also of their heterogynous working efficiencies. This modelling approach has led to a nonlinear optimization model with mixed variables. We present: the problem under study, the greedy algorithm used to solve it, and then results in comparison with those of the genetic algorithms.