|
New Method of reducing the secondary arc duration time for E.H.V. Lines
|
|
|
Case study on GIS defects and new possibilities for preventive maintenance
|
|
|
Very Fast transient
|
|
|
Synchronous closing control for shunt capacitors
|
|
|
Controlling the switching operation for three phases reclosing in extra high voltage systems
|
|
|
Application of point - on - wave controlled switching on the 750 KV circuit breakers used for shunt reactor switching off
|
|
|
Very fast transients and theirs effect on transformer winding
|
|
|
Use of neutral reactors for improving the successfulness of three phase reclosing
|
|
|
An on-line fuzzy logic system for voltage/var control and alarm processing
|
|
|
Controlled Switching of Condensers
|
|