| publication name | Forced elastic displacement at the bearings of statically Indeterminate framed steel structures |
|---|---|
| Authors | HH Eltobgy |
| year | 2004 |
| keywords | |
| journal | |
| volume | Not Available |
| issue | Not Available |
| pages | Not Available |
| publisher | Not Available |
| Local/International | International |
| Paper Link | Not Available |
| Full paper | download |
| Supplementary materials | Not Available |
Abstract
One of the trends of technical advance in the field of construction, which insures a higher level of engineering, is the optimum use of structural materials in building structures. The principal concept of the present study is to enhance the efficiency of the framed steel structures by applying the pre-stressing concept to increase the load carrying capacity. One should not overlook the fact that the traditional means of pre-stressing often entails additional consumption of high price materials for auxiliary components (tendons, anchors, …. etc). The present study will follow untraditional means of pre-stressing which will reduce both the cost and effort. A proposed method will be applied using the forced elastic displacement of the bearings of framed steel structures during the erection phase or even it may be successfully used to reinforce structures already in service through the redistribution of the pre-stressing moments to obtain stresses of the sign opposite to that from the dead load. When applying this method it is possible to enhance the load bearing capacity and to have lesser final strains, which will reduce the final deflection.