Banner

Assessing the Risk of the Aswan High Dam Breaching

Engineering Research Journal • 2011
العودة
معلومات البحث
المؤلفون Fahmy S. Abdelhaleem, Helal Y. Esam, Ibrahim S.A, and Sobeih M.F
الكلمات المفتاحية Dam Breach, Outflow hydrograph, Aswan High Dam, Simulation Model
المجلة العلمية Engineering Research Journal
الناشر Faculty of Engineering, Minoufiya University
المجلد Not Available
العدد Not Available
الصفحات Not Available
publication.type Local
رابط البحث Not Available
المواد المرفقة Not Available
الملخص
The present paper assesses the risk of the Aswan High Dam breaching, numerically. Literature, in the field of dam breaching, was reviewed. The Aswan High Dam was visited. Site data, so as measurements data, were collected and analyzed. A suitable numerical model was chosen and was selected to be implemented. Scenarios were designed. The expected impacts of the Aswan High Dam failure that might result from overtopping or piping was simulated and the obtained results were analyzed. Outflow hydrographs due to the failure mode were obtained and analyzed. A risk assessment to the dam breaching was achieved. The results of this investigation could be further applied and could assist decision makers to set a plan to confront the risks of the Aswan High Dam failure.