Theme-Logo
  • Login
  • Home
  • Course
  • Publication
  • Theses
  • Reports
  • Published books
  • Workshops / Conferences
  • Supervised PhD
  • Supervised MSc
  • Supervised projects
  • Education
  • Language skills
  • Positions
  • Memberships and awards
  • Committees
  • Experience
  • Scientific activites
  • In links
  • Outgoinglinks
  • News
  • Gallery
publication name Assessing the Risk of the Aswan High Dam Breaching
Authors Fahmy S. Abdelhaleem, Helal Y. Esam, Ibrahim S.A, and Sobeih M.F
year 2011
keywords Dam Breach, Outflow hydrograph, Aswan High Dam, Simulation Model
journal Engineering Research Journal
volume Not Available
issue Not Available
pages Not Available
publisher Faculty of Engineering, Minoufiya University
Local/International Local
Paper Link Not Available
Full paper download
Supplementary materials Not Available
Abstract

The present paper assesses the risk of the Aswan High Dam breaching, numerically. Literature, in the field of dam breaching, was reviewed. The Aswan High Dam was visited. Site data, so as measurements data, were collected and analyzed. A suitable numerical model was chosen and was selected to be implemented. Scenarios were designed. The expected impacts of the Aswan High Dam failure that might result from overtopping or piping was simulated and the obtained results were analyzed. Outflow hydrographs due to the failure mode were obtained and analyzed. A risk assessment to the dam breaching was achieved. The results of this investigation could be further applied and could assist decision makers to set a plan to confront the risks of the Aswan High Dam failure.

Benha University © 2023 Designed and developed by portal team - Benha University