Optimal design configuration and operating sequencing of hybrid chiller plant: A case study of hotel building in Cairo, Egypt
Journal of Building Engineering • 2021
Publication Information
Authors
T.A. Mouneer, M.H. Aly, E.M. Mina
Keywords
Hybrid chiller plant, Hotel building, Chiller sequencing, Building cooling, Building air conditioning, Cairo climate
Journal
Journal of Building Engineering
Publisher
Elesevier
Volume
42
Issue
102796
Pages
Not Available
publication.type
International
Paper Link
Open Link
Supplementary Materials
Not Available
Abstract
This research demonstrates the optimal design option and operating sequencing for hybrid chillers plant which can use two different energy sources. The purpose of the investigation focus on Sofitel Cairo Nile El-Gezirah Hotel, nestled within Al-Zamalek island in Cairo, Egypt, as a case study in current research. Special attention is given to its round façade which gives special characterised cooling load profiles. The study compromises two main design configurations from A.I to A.V with 5 options and from B.I to B.VI with 6 options, to investigate and compare several operating sequences for hybrid chiller plant (HCP) of 4000 TR. The first investigation employs systematic calculation for the initial and running costs of the HCP with design configurations A and B. The second investigation compares their several operating sequences for design configurations A and B. The results of performance parameters such as coefficient of performance for hybrid chiller plant records variations in the running cost using hourly analysis from time 00:00 to 23:59 in response of variation in solar radiation, external loads, and internal loads. Concerning the results of these two analyses, the finding depicts the optimal design configuration, besides the best operating sequence for each design configuration regarding the estimated operational
data for each design option and operating sequence under the building applied cooling loads during the summer season with Cairo climate conditions.
data for each design option and operating sequence under the building applied cooling loads during the summer season with Cairo climate conditions.