Standard Swarm Optimization to Solve Machine Scheduling Problem with Fuzzy Starting Time
IJCSI International Journal of Computer Science • 2014
Publication Information
Authors
Y. M. Assem ; A. A. El-sawy ; Y. A. Nada
Keywords
Machine Time Scheduling, Particle Swarm optimization, Fuzzy, Time Window, Trapezoid membership function, mean max defuzzification method.
Journal
IJCSI International Journal of Computer Science
Publisher
Not Available
Volume
11
Issue
5
Pages
64-69
publication.type
International
Paper Link
Not Available
Supplementary Materials
Not Available
Abstract
One of machine scheduling problems called machine time scheduling. The starting time in this problem will be assumed
fuzzy with trapezoid membership function. A standard particle swarm optimization algorithm with constriction factor has been developed to find the best shape of membership function to find best starting time for each machine in each cycle by mean max defuzzification method.
fuzzy with trapezoid membership function. A standard particle swarm optimization algorithm with constriction factor has been developed to find the best shape of membership function to find best starting time for each machine in each cycle by mean max defuzzification method.
Staff Members - Benha University