Email-based system for documenting construction as-built details
Automation in Construction • 2012
معلومات البحث
المؤلفون
Tarek Hegazy, Mohamed Abdel-Monem
الكلمات المفتاحية
Construction management; Email; Project control; As-built; Project control; Progress tracking; Computer application
المجلة العلمية
Automation in Construction
الناشر
Elsevier B.V.
المجلد
24
العدد
Not Available
الصفحات
8
publication.type
International
رابط البحث
Open Link
المواد المرفقة
Not Available
الملخص
Detailed as-built information is essential for progress tracking, corrective actions, and schedule analysis. As-built documentation, however, has mainly been a manual process that is time-consuming and error-prone. This paper proposes a low-cost framework that utilizes prevailing communication tools (email) to develop a project-wide system for progress tracking and bidirectional communication between project participants and head office. The framework integrates three main components: email forms for site data collection; customized scheduling application; and customized email application. In the schedule, the activities automatically initiate email requests for as-built information using an email form that has a checklist of possible site events and enables supervisors to attach notes and any requests for information. On a daily basis, the system automatically reads the supervisors' response emails and updates the schedule with all recorded as-built details. The paper discusses the development of a prototype system and demonstrates its usefulness on a small bridge-pier foundation example.
أعضاء هيئة التدريس - جامعة بنها