OPTIMUM VALUE OF QUALITY COST IN WATER STRUCTURES PROJECTS BY USING CONFORMANCE-NONCONFORMANCE (CNC) MODEL
• 2019
معلومات البحث
المؤلفون
Mohamed Abdel-Hamid Mohamed, Hanaa Mohamed Abdelhaleem
الكلمات المفتاحية
cost of quality, conformance cost, nonconformance cost, water structures
projects
المجلة العلمية
Not Available
الناشر
Not Available
المجلد
Not Available
العدد
Not Available
الصفحات
Not Available
publication.type
International
رابط البحث
Not Available
المواد المرفقة
Not Available
الملخص
In Egypt, which has one of the fastest developing construction markets in Middle
East, it is very important to estimate the cost of quality of these projects. The objective
of this paper is to estimate the cost of quality and determine its optimum values in the
Egyptian construction projects by applying the conformance-nonconformance (CNC)
model to water structures projects. The research showed that the actual cost of quality
(COQ) value represents 1.54% of the entire project cost and that the optimal quality
cost value was calculated to be 1.99% of the entire quality cost. On the other hand,
conformance cost of quality was found to be 1.10% and nonconformance cost of quality
was found to be 0.44% of the total project cost.
East, it is very important to estimate the cost of quality of these projects. The objective
of this paper is to estimate the cost of quality and determine its optimum values in the
Egyptian construction projects by applying the conformance-nonconformance (CNC)
model to water structures projects. The research showed that the actual cost of quality
(COQ) value represents 1.54% of the entire project cost and that the optimal quality
cost value was calculated to be 1.99% of the entire quality cost. On the other hand,
conformance cost of quality was found to be 1.10% and nonconformance cost of quality
was found to be 0.44% of the total project cost.
أعضاء هيئة التدريس - جامعة بنها