"The Mitigation Measures of Sediment Deposition in-front of El Kuraimat Power Plant Intake". Journal of Scientific and Engineering Research (JSAER), India, June 2016

The objectives of the current research were to mitigate the sedimentation problem in front of thermal power plant intakes, case study, El Kuraimat thermal power plant, also investigate the effectiveness of a set of alternatives to solve this problem. Several sorts of data were collected including, velocity measurements, hydrographic survey data, water levels and discharges in several years and seasons. 2-D numerical model, iRIC "international River Interface Corporative" was utilized to simulate the study area and test the set of alternatives to meet the optimum solution, the model was calibrated and verified using the field velocities and water levels. The set of alternatives were used to improve the flow pattern inside the eastern channel, where the plant intake was located. The model results were revealed that connecting the small formed island and the downstream tip of El Kuraimat island to bed level 23.00 m, was the optimum solution from both the hydraulic and economical point of view. • 2016
العودة
معلومات البحث
المؤلفون Gamal Elsaeed, Mohammad Bahgat, Mohammad Ibrahim and Rowida Elsayed
الكلمات المفتاحية Not Available
المجلة العلمية The objectives of the current research were to mitigate the sedimentation problem in front of thermal power plant intakes, case study, El Kuraimat thermal power plant, also investigate the effectiveness of a set of alternatives to solve this problem. Several sorts of data were collected including, velocity measurements, hydrographic survey data, water levels and discharges in several years and seasons. 2-D numerical model, iRIC "international River Interface Corporative" was utilized to simulate the study area and test the set of alternatives to meet the optimum solution, the model was calibrated and verified using the field velocities and water levels. The set of alternatives were used to improve the flow pattern inside the eastern channel, where the plant intake was located. The model results were revealed that connecting the small formed island and the downstream tip of El Kuraimat island to bed level 23.00 m, was the optimum solution from both the hydraulic and economical point of view.
الناشر Not Available
المجلد 3
العدد 3
الصفحات 155-164
publication.type International
رابط البحث Not Available
المواد المرفقة Not Available
الملخص
The objectives of the current research were to mitigate the sedimentation problem in front of thermal power plant intakes, case study, El Kuraimat thermal power plant, also investigate the effectiveness of a set of alternatives to solve this problem. Several sorts of data were collected including, velocity measurements, hydrographic survey data, water levels and discharges in several years and seasons. 2-D numerical model, iRIC "international River Interface Corporative" was utilized to simulate the study area and test the set of alternatives to meet the optimum solution, the model was calibrated and verified using the field velocities and water levels. The set of alternatives were used to improve the flow pattern inside the eastern channel, where the plant intake was located. The model results were revealed that connecting the small formed island and the downstream tip of El Kuraimat island to bed level 23.00 m, was the optimum solution from both the hydraulic and economical point of view.