"Evaluation of the short and long- term efficiencies of electro-chemical chloride extraction", Cement and Concrete Research, Vol. 39, No 8, pp. 727-732, August.
• 2009
معلومات البحث
المؤلفون
Abdelaziz, G. E., Abdelalim, A. M. K. and Fawzy, Y. A.
الكلمات المفتاحية
Not Available
المجلة العلمية
Not Available
الناشر
Not Available
المجلد
Not Available
العدد
Not Available
الصفحات
Not Available
publication.type
International
رابط البحث
Not Available
المواد المرفقة
Not Available
الملخص
The short and long-term effects of electro-chemical chloride extraction (ECE) treatment on corrosion rate of
corroded reinforcement have been studied. The factors controlling ECE treatment were identified, and the
alterations which occurred in the chloride profile of the cover zone due to ECE process were followed.
Contaminated reinforced OPC and SRC mortar specimens made with 1 or 2% NaCl, by mass of cement, were
prepared, cured and then subjected to 3 or 5% NaCl for one year. These specimens were finally treated with
ECE using various impressed current densities (1 and 2 A/m2) and electrolytes (water and calcium
hydroxide) for 2, 4 and 8 weeks. The state of corrosion was monitored regularly every 2 weeks from halting
ECE process up to 52 weeks using zero-resistance ammeter device for measuring the corrosion current
density of reinforcement. Selected samples from the cover zone of the untreated and treated specimens were
finally taken to assess their chloride profiles.
corroded reinforcement have been studied. The factors controlling ECE treatment were identified, and the
alterations which occurred in the chloride profile of the cover zone due to ECE process were followed.
Contaminated reinforced OPC and SRC mortar specimens made with 1 or 2% NaCl, by mass of cement, were
prepared, cured and then subjected to 3 or 5% NaCl for one year. These specimens were finally treated with
ECE using various impressed current densities (1 and 2 A/m2) and electrolytes (water and calcium
hydroxide) for 2, 4 and 8 weeks. The state of corrosion was monitored regularly every 2 weeks from halting
ECE process up to 52 weeks using zero-resistance ammeter device for measuring the corrosion current
density of reinforcement. Selected samples from the cover zone of the untreated and treated specimens were
finally taken to assess their chloride profiles.
أعضاء هيئة التدريس - جامعة بنها