Comparing socioeconomic & environmental impacts of building 2GW PV power plant in both sides of the Medeterranian
Renewable and Sustainable Energy Conference (IRSEC), 2013 International • 2013
معلومات البحث
المؤلفون
Ahmed MAM Serag ElDin, Yehia El-Mahgary, Ahmed Hamza H Ali, Ahmed Khairy
الكلمات المفتاحية
Not Available
المجلة العلمية
Renewable and Sustainable Energy Conference (IRSEC), 2013 International
الناشر
IEEE
المجلد
Not Available
العدد
Not Available
الصفحات
Not Available
publication.type
International
رابط البحث
Open Link
المواد المرفقة
Not Available
الملخص
One of the most important and challenging task in the near future is the
construction of large PV Power Plants (PP) on both sides of the Mediterranean. The Solar
Power Plants built In Italy, Spain and Germany exceeds already several GW, whereas few
projects are just starting on the other side of the Mediterranean (Tunisia, Algeria and
Morocco). No projects exist yet in Egypt, although the solar radiation in Egypt is the highest
in the world. The socioeconomic difficulties facing the construction of large PV plants in ...
construction of large PV Power Plants (PP) on both sides of the Mediterranean. The Solar
Power Plants built In Italy, Spain and Germany exceeds already several GW, whereas few
projects are just starting on the other side of the Mediterranean (Tunisia, Algeria and
Morocco). No projects exist yet in Egypt, although the solar radiation in Egypt is the highest
in the world. The socioeconomic difficulties facing the construction of large PV plants in ...
أعضاء هيئة التدريس - جامعة بنها